TMinusZero
Loading
Preparing the latest launch data.
TMinusZero
Loading
Preparing the latest launch data.
Dossier // 01-BO-PRG
A high-density technical record of Blue Origin's orbital and suborbital operations. Merging flight manifest data with Sam.gov procurement signals and verified engineering milestones.
New Shepard Snapshot
Official totals, latest mission, and current launch posture.
Flights Tracked
38
New Shepard missions in feed
Humans Flown
98
92 unique individuals
Last Flight
NS-38Upcoming Flights
0
Listed in current launch feed
Program Status
Paused
Flights are paused for no less than two years while Blue Origin prioritizes orbital operations.
Status source: Blue Origin (January 30, 2026)
Crew and payloads are rendered by verified flight roster when official seat indexes are unavailable. Manifests start at the earliest flight and cycle infinitely.
Manifest 1 / 45
Status: Success
Capsule
New Shepard | NS-1
Architectural overview of propulsion systems and space vehicles.
Blue Origin's lunar lander family and mission architecture for Artemis and lunar cargo or crewed surface logistics campaigns.
Blue Origin's in-space logistics and mobility platform for long-duration operations, hosting, transportation, and mission services.
Blue Origin's heavy-lift orbital launch vehicle program supporting commercial, civil, and national security mission classes.
Blue Origin's reusable suborbital system for human spaceflight and research payloads, with vertically landed booster operations.
BE-3PM powers New Shepard with reusable vertical-launch and landing mission profiles for suborbital flight.
BE-3U is the vacuum-optimized BE-3 derivative used for upper-stage mission architecture planning.
BE-4 is Blue Origin's methane-oxygen staged-combustion engine family for heavy-lift launch integration.
BE-7 is the lunar landing engine program for Blue Moon, designed for precision descent and throttle control.
Linked SAM.gov contract awards, SAM.gov opportunities, and USASpending financial records.
Showing 25 of 443
Relevant Blue Origin awards and notices that are in scope for the hub but still awaiting an exact story join.
Relevant SAM.gov leads will appear here when records are in scope for Blue Origin but not yet safely attached to an exact contract story.
Unified stream of technical milestones and official social intelligence.
Program-level fallback event keeps timeline continuity when feed-derived events are sparse.
Tracked image and video archive supporting program evidence.

Launch cache

NASASpaceflight

NASASpaceflight

SpaceNews

SpaceNews

Arstechnica

Spaceflight Now

NASASpaceflight

Arstechnica

SpaceNews

SpacePolicyOnline.com

Arstechnica

Tory recalls a moment in his career at China Lake where an event that seemed like a failure led to success.

Welcome to Ascending Node. Our premiere episode features an in-depth conversation between Tory Bruno and Tabitha Lipkin, exploring leadership, national security strategy, and the evolution of commercial spaceflight.


BE-7 Flight Engine 3 has completed hotfire testing, verifying engine performance prior to flight. Next, it will head to Lunar Plant 1 to join the lunar lander engine fleet.

New Glenn's third mission lifted off on Sunday, April 19, 2026, from Launch Complex 36 at Cape Canaveral Space Force Station.

Linked from launch record New Glenn | BlueBird Block 2 #2.

Linked from launch record New Glenn | BlueBird Block 2 #2.

Welcome back to LC-36, "Never Tell Me The Odds." Next up: NG-3 hotfire 🔥