TMinusZero
Loading
Preparing the latest launch data.
TMinusZero
Loading
Preparing the latest launch data.
Event
NASA will roll out their second fully stacked Space Launch System (SLS) rocket back to LC-39B after a rollback from the pad to investigate issues with the upper stage helium tanks. The rollout is expected to take up to 12 hours.

Artemis II SLS Rollout #2 is the event record for catalog id 1336.
NASA will roll out their second fully stacked Space Launch System (SLS) rocket back to LC-39B after a rollback from the pad to investigate issues with the upper stage helium tanks. The rollout is expected to take up to 12 hours.
No related launch rows are currently resolved for this catalog record.
This record is built from the Launch Library 2 public catalog cache. The page keeps provider, pad, vehicle, astronaut, event, and location records separate from launch detail pages so source-backed facts stay easy to audit.
Artemis II SLS Rollout #2 is treated as a non-launch event record. Use it for event identity, event timing, type, external references, and any linked launch context rather than as a primary launch schedule page.
This page owns the catalog record. Collection pages own browsing, launch pages own mission timing and status, and the info hub explains the wider public-data surface.
Data provided by The Space Devs - Launch Library 2.