Gemini SC7
Gemini SC7 is the Gemini capsule used for the Gemini 7 mission launched on December 4, 1965 and crewed by astronauts Frank Borman (command pilot) and Jim Lovell (pilot).
TMinusZero
Loading
Preparing the latest launch data.
Launch Detail
Loading launch detail
Pulling launch timing, vehicle context, weather signals, and mission evidence.
Launch detail
National Aeronautics and Space Administration • Titan II GLV • Launch Complex 19 (FL)

National Aeronautics and Space Administration • Titan II GLV • LC-19
Top answer
Gemini 7 was the fourth crewed mission of the NASA's Project Gemini. The mission was commanded by Command Pilor Frank F. Borman, II and Pilot James A. Lovell, Jr. The crew spent nearly 14 days in space, and their spacecraft was the passive target for the first crewed space rendezvous performed by Gemini 6A. The mission began on December 4, 1965, 19:30:03 UTC and ended on December 18, 1965, 14:05:04 UTC.
Last refreshed: Jun 14, 2023, 1:40 PM EDT. T-Minus Zero keeps this as the canonical launch record and reconciles schedule, mission, payload, media, and provider signals when those records are available.
Stream links and embedded coverage.
Premium keeps the launch-by-launch change log visible so you can review slips, window edits, and status changes without waiting for an error-driven upgrade prompt.
Free-to-share photography matched to this launch. Tap a photo to view it at full resolution.
Gemini VII (Gemini 7) PatchEnhanced forecast insights (select launches).
Premium adds the higher-signal weather shell for select Eastern Range launches, including the extra launch criteria and fast-read risk rows.
Launch-stage and landing context surfaced from LL2 when it exists.
Gemini SC7 is the Gemini capsule used for the Gemini 7 mission launched on December 4, 1965 and crewed by astronauts Frank Borman (command pilot) and Jim Lovell (pilot).
The Gemini spacecraft safely splashed down in the Atlantic Ocean.
Gemini 7 was the fourth crewed mission of the NASA's Project Gemini. The mission was commanded by Command Pilor Frank F. Borman, II and Pilot James A. Lovell, Jr. The crew spent nearly 14 days in space, and their spacecraft was the passive target for the first crewed space rendezvous performed by Gemini 6A. The mission began on December 4, 1965, 19:30:03 UTC and ended on December 18, 1965, 14:05:04 UTC.

Alternate mission URLs consolidate to this canonical launch record so exact mission timing, status, media, and source context stay on one page.
Use these internal paths to move from this exact launch record into the provider, vehicle, launch-site, schedule, and mission-family pages that own broader context.
This launch currently has no dedicated mission-family hub, so provider, vehicle, site, and canonical record links are the primary internal paths.
Some high-demand launch records carry specialized search intent. These profiles explain what can be verified from the published record without filling gaps that upstream sources have not published.
Crew and spacecraft evidence is grouped from published launch, crew, payload, program, agency, source-link, and status records so the page can answer astronaut, spacecraft, destination, provider, and schedule intent without inventing unpublished manifest details.
Key structured fields for this launch record are grouped here so the page answers mission, payload, orbit, provider, source, and timing questions before the deeper tracking and media sections.
This record is preserved as historical launch context. The page emphasizes what was launched, the vehicle and pad involved, published outcome/status fields, linked programs, and source records instead of treating the mission like an upcoming countdown.
Open the launch pad in Google Maps satellite mode using the pad coordinates.
Gemini 7 was the fourth crewed mission of the NASA's Project Gemini. The mission was commanded by Command Pilor Frank F. Borman, II and Pilot James A. Lovell, Jr. The crew spent nearly 14 days in space, and their spacecraft was the passive target for the first crewed space rendezvous performed by Gemini 6A. The mission began on December 4, 1965, 19:30:03 UTC and ended on December 18, 1965, 14:05:04 UTC.
The Titan II GLV (Gemini Launch Vehicle) or Gemini-Titan II was an American expendable launch system derived from the Titan II missile, which was used to launch twelve Gemini missions for NASA between 1964 and 1966. Two unmanned launches followed by ten manned ones were conducted from Launch Complex 19 at the Cape Canaveral Air Force Station, starting with Gemini 1 on April 8, 1964.
The National Aeronautics and Space Administration is an independent agency of the executive branch of the United States federal government responsible for the civilian space program, as well as aeronautics and aerospace research. NASA have many launch facilities but most are inactive. The most commonly used pad will be LC-39B at Kennedy Space Center in Florida.
b96b35e4268e9b385f417dbaf0091dd1665285d6e98d16f0bd39b894f4d86aafProvider, rocket, pad, and booster history tied to this launch.