Loading
TMinusZero
Loading
Preparing the latest launch data.
TMinusZero
Loading
Preparing the latest launch data.
Contract Detail
X-BAND MAINTENANCE AND THE FALCON 9 C2/C3 LAUNCH RADAR TRACKING AND ANALYSIS, UTILIZING THE NASA DIAGNOSTIC RADAR SYSTEM
Delta: $336,798 • Cumulative: $336,798
Source: derived-fallback
Obligations: $336,798 • Outlays: N/A