Skip to main content
T-Minus ZeroComm Link
Artemis Hub logo

Contract Story

ASST_NON_80NSSC26K0368_080|

THE LUNAR POLAR HYDROGEN MAPPER (LUNAH-MAP) MISSION LAUNCHED ABOARD ARTEMIS I WAS DESIGNED TO MAP HYDROGEN AT THE LUNAR SOUTH POLE USING HIGH-RESOLUTION NEUTRON SPECTROSCOPY. ALTHOUGH THE SPACECRAFT DID NOT REACH ITS INTENDED ORBIT THE MINIATURE N

PIID: ASST_NON_80NSSC26K0368_080Mission: Artemis IFamily size: 1Actions: 1Notices: 0Bidders: 0

Contract Family

  • ASST_NON_80NSSC26K0368_080|

    Awardee: ARIZONA STATE UNIVERSITY · Base award: Feb 26, 2026

    unknown

    THE LUNAR POLAR HYDROGEN MAPPER (LUNAH-MAP) MISSION LAUNCHED ABOARD ARTEMIS I WAS DESIGNED TO MAP HYDROGEN AT THE LUNAR SOUTH POLE USING HIGH-RESOLUTION NEUTRON SPECTROSCOPY. ALTHOUGH THE SPACECRAFT DID NOT REACH ITS INTENDED ORBIT THE MINIATURE N

    Parent award:
    n/a
    Referenced IDV:
    n/a
    Agency code:
    n/a
    Subtier code:
    n/a

Action Timeline

  • Mod 02026-02-26

    Delta: $24,996 • Cumulative: N/A

    Source: usaspending

Opportunity & Bidding Signals

Who is or was on the solicitation thread, with opportunity notices and awardee names.

No notices are currently linked to this PIID.

Funding Trend

First action: Feb 26, 2026Latest action: Feb 26, 2026Total obligations points: 1
  • FY 2026 M05usaspending

    Obligations: $24,996 • Outlays: N/A