TMinusZero
Loading
Preparing the latest launch data.
TMinusZero
Loading
Preparing the latest launch data.

Contract Story
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A STUDY FOR PHASE 3 MODIFY VEHICLE ASSEMBLY BUILDING FOR SPACE LAUNCH SYSTEM BLOCK 1B. PROJECT CONTROL NUMBER (PCN) 99500.1.
CONT_AWD_80KSC024FA070_8000_80KSC022DA115_8000|
Awardee: MERRICK & COMPANY · Base award: Aug 06, 2024
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A STUDY FOR PHASE 3 MODIFY VEHICLE ASSEMBLY BUILDING FOR SPACE LAUNCH SYSTEM BLOCK 1B. PROJECT CONTROL NUMBER (PCN) 99500.1.
Delta: $208,813 • Cumulative: N/A
Source: usaspending
Delta: $208,813 • Cumulative: N/A
Source: usaspending
Delta: $208,813 • Cumulative: N/A
Source: usaspending
Delta: $208,813 • Cumulative: N/A
Source: usaspending
Delta: $208,813 • Cumulative: N/A
Source: usaspending
Delta: $208,813 • Cumulative: N/A
Source: usaspending
Delta: $208,813 • Cumulative: N/A
Obligations: $1,252,878 • Outlays: N/A
Source: usaspending
Who is or was on the solicitation thread, with opportunity notices and awardee names.
No notices are currently linked to this PIID.