Skip to main content
T-Minus ZeroComm Link
Loading

TMinusZero

Loading

Preparing the latest launch data.

PROJECT TITLE: ABITA SPRINGS TRAILS, PHASE 2 :::: PROJECT DESCRIPTION: SCOPE: CONSTRUCT 3,160' OF FIBER REINFORCED WALKWAYS THAT ARE 4' WIDE, 4000 PSI AT LOCATIONS ON HICKORY ST., LIVE OAK ST., GROVER ST., AND LAUREL STREETS. THE THICKNESS WILL BE 4' IN AREAS WITH NO VEHICULAR TRAFFIC. WHERE THERE IS VEHICULAR TRAFFIC, THE THICKNESS OF THE CONCRETE WILL BE HIGH EARLY STRENGTH, 6' THICK AND REINFORCED WITH 6' BY 6' GAGE HIGHWAY MESH. | Blue Origin Contract Detail | T-Minus Zero