THIS 2010 NASA SBIR PHASE 1 PROPOSAL FOR AN INNOVATIVE LOW-FIELD VECTOR MAGNETOMETER (V-400-LF) IS A RESPONSE TO SUBTOPIC S1.06 PARTICLES AND FIELD SENSORS AND INSTRUMENT ENABLING TECHNOLOGIES. THE V-400-LF INSTRUMENT IS INTENDED FOR MAKING HIGH-RESOLUTION MAGNETIC FIELD MEASUREMENTS OF PLANETS AND IN INTERPLANETARY SPACE ON SMALL SATELLITES AND SPACECRAFT. THE PHASE 1 EFFORT INCLUDES DEVELOPMENT OF DESIGNS FOR ADVANCED MINIATURIZED COMPONENTS AND A CONCEPTUAL DESIGN FOR A MINIATURIZED V-400-LF INSTRUMENT IN ORDER TO ESTABLISH THE FEASIBILITY OF DESIGNING AND FABRICATING A PROTOTYPE V 400-LF IN PHASE 2. LASER-PUMPED HELIUM MAGNETOMETERS HAVE PROVEN TO BE WORLD-CLASS INSTRUMENTS FOR MEASURING THE DIRECTION AND MAGNITUDE OF THE GEOMAGNETIC AND PLANETARY FIELDS. THE V-400-LF WILL BUILD ON THE HERITAGE OF THE LOW-FIELD VECTOR HELIUM MAGNETOMETER (LVHM), THE SCALAR HELIUM MAGNETOMETER (SHM), AND THE LASER-PUMPED VECTOR/SCALAR SELF-CALIBRATING VECTOR HELIUM MAGNETOMETER (SVHM). THE GOAL OF PHASE 1 IS DEVELOPMENT OF A CONCEPTUAL DESIGN FOR A MINIATURIZED INSTRUMENT APPROPRIATE FOR SMALL SPACECRAFT AND MICROSATELLITES. THIS MINIATURIZATION WILL BE ACCOMPLISHED THROUGH THE USE OF ADVANCED MINIATURIZED COMPONENTS AND PACKAGING METHODS FOR THE V-400-LF SENSOR AND ELECTRONICS. THE V-400-LF CAN BE USED TO MEASURE VECTOR COMPONENTS OF LOW MAGNETIC FIELDS, SCALAR GRADIENTS (DIFFERENCE OF VECTOR MAGNITUDE MEASUREMENTS FROM TWO V-400-LF INSTRUMENTS), AND GRADIENT TENSOR ELEMENTS (DIFFERENCE BETWEEN VECTOR COMPONENTS USING THREE OR MORE INSTRUMENTS) WITH VERY HIGH STABILITY AND ACCURACY. THE V-400-LF WILL HAVE A DYNAMIC RANGE OF +/- 1,000 NT, A SENSITIVITY OF 10 PT/RTHZ AT 1 HZ, AND A CALIBRATED ACCURACY OF +/- 0.5 NT. THE SAMPLE RATE WILL BE 430 HZ. THE TRL IS EXPECTED TO BE 4 AT THE END OF THE PHASE 1 CONTRACT. | Contract Data Entity | T-Minus Zero
Exact Contract Story
THIS 2010 NASA SBIR PHASE 1 PROPOSAL FOR AN INNOVATIVE LOW-FIELD VECTOR MAGNETOMETER (V-400-LF) IS A RESPONSE TO SUBTOPIC S1.06 PARTICLES AND FIELD SENSORS AND INSTRUMENT ENABLING TECHNOLOGIES. THE V-400-LF INSTRUMENT IS INTENDED FOR MAKING HIGH-RESOLUTION MAGNETIC FIELD MEASUREMENTS OF PLANETS AND IN INTERPLANETARY SPACE ON SMALL SATELLITES AND SPACECRAFT. THE PHASE 1 EFFORT INCLUDES DEVELOPMENT OF DESIGNS FOR ADVANCED MINIATURIZED COMPONENTS AND A CONCEPTUAL DESIGN FOR A MINIATURIZED V-400-LF INSTRUMENT IN ORDER TO ESTABLISH THE FEASIBILITY OF DESIGNING AND FABRICATING A PROTOTYPE V 400-LF IN PHASE 2. LASER-PUMPED HELIUM MAGNETOMETERS HAVE PROVEN TO BE WORLD-CLASS INSTRUMENTS FOR MEASURING THE DIRECTION AND MAGNITUDE OF THE GEOMAGNETIC AND PLANETARY FIELDS. THE V-400-LF WILL BUILD ON THE HERITAGE OF THE LOW-FIELD VECTOR HELIUM MAGNETOMETER (LVHM), THE SCALAR HELIUM MAGNETOMETER (SHM), AND THE LASER-PUMPED VECTOR/SCALAR SELF-CALIBRATING VECTOR HELIUM MAGNETOMETER (SVHM). THE GOAL OF PHASE 1 IS DEVELOPMENT OF A CONCEPTUAL DESIGN FOR A MINIATURIZED INSTRUMENT APPROPRIATE FOR SMALL SPACECRAFT AND MICROSATELLITES. THIS MINIATURIZATION WILL BE ACCOMPLISHED THROUGH THE USE OF ADVANCED MINIATURIZED COMPONENTS AND PACKAGING METHODS FOR THE V-400-LF SENSOR AND ELECTRONICS. THE V-400-LF CAN BE USED TO MEASURE VECTOR COMPONENTS OF LOW MAGNETIC FIELDS, SCALAR GRADIENTS (DIFFERENCE OF VECTOR MAGNITUDE MEASUREMENTS FROM TWO V-400-LF INSTRUMENTS), AND GRADIENT TENSOR ELEMENTS (DIFFERENCE BETWEEN VECTOR COMPONENTS USING THREE OR MORE INSTRUMENTS) WITH VERY HIGH STABILITY AND ACCURACY. THE V-400-LF WILL HAVE A DYNAMIC RANGE OF +/- 1,000 NT, A SENSITIVITY OF 10 PT/RTHZ AT 1 HZ, AND A CALIBRATED ACCURACY OF +/- 0.5 NT. THE SAMPLE RATE WILL BE 430 HZ. THE TRL IS EXPECTED TO BE 4 AT THE END OF THE PHASE 1 CONTRACT.
THIS 2010 NASA SBIR PHASE 1 PROPOSAL FOR AN INNOVATIVE LOW-FIELD VECTOR MAGNETOMETER (V-400-LF) IS A RESPONSE TO SUBTOPIC S1.06 PARTICLES AND FIELD SENSORS AND INSTRUMENT ENABLING TECHNOLOGIES. THE V-400-LF INSTRUMENT IS INTENDED FOR MAKING HIGH-RESOLUTION MAGNETIC FIELD MEASUREMENTS OF PLANETS AND IN INTERPLANETARY SPACE ON SMALL SATELLITES AND SPACECRAFT. THE PHASE 1 EFFORT INCLUDES DEVELOPMENT OF DESIGNS FOR ADVANCED MINIATURIZED COMPONENTS AND A CONCEPTUAL DESIGN FOR A MINIATURIZED V-400-LF INSTRUMENT IN ORDER TO ESTABLISH THE FEASIBILITY OF DESIGNING AND FABRICATING A PROTOTYPE V 400-LF IN PHASE 2. LASER-PUMPED HELIUM MAGNETOMETERS HAVE PROVEN TO BE WORLD-CLASS INSTRUMENTS FOR MEASURING THE DIRECTION AND MAGNITUDE OF THE GEOMAGNETIC AND PLANETARY FIELDS. THE V-400-LF WILL BUILD ON THE HERITAGE OF THE LOW-FIELD VECTOR HELIUM MAGNETOMETER (LVHM), THE SCALAR HELIUM MAGNETOMETER (SHM), AND THE LASER-PUMPED VECTOR/SCALAR SELF-CALIBRATING VECTOR HELIUM MAGNETOMETER (SVHM). THE GOAL OF PHASE 1 IS DEVELOPMENT OF A CONCEPTUAL DESIGN FOR A MINIATURIZED INSTRUMENT APPROPRIATE FOR SMALL SPACECRAFT AND MICROSATELLITES. THIS MINIATURIZATION WILL BE ACCOMPLISHED THROUGH THE USE OF ADVANCED MINIATURIZED COMPONENTS AND PACKAGING METHODS FOR THE V-400-LF SENSOR AND ELECTRONICS. THE V-400-LF CAN BE USED TO MEASURE VECTOR COMPONENTS OF LOW MAGNETIC FIELDS, SCALAR GRADIENTS (DIFFERENCE OF VECTOR MAGNITUDE MEASUREMENTS FROM TWO V-400-LF INSTRUMENTS), AND GRADIENT TENSOR ELEMENTS (DIFFERENCE BETWEEN VECTOR COMPONENTS USING THREE OR MORE INSTRUMENTS) WITH VERY HIGH STABILITY AND ACCURACY. THE V-400-LF WILL HAVE A DYNAMIC RANGE OF +/- 1,000 NT, A SENSITIVITY OF 10 PT/RTHZ AT 1 HZ, AND A CALIBRATED ACCURACY OF +/- 0.5 NT. THE SAMPLE RATE WILL BE 430 HZ. THE TRL IS EXPECTED TO BE 4 AT THE END OF THE PHASE 1 CONTRACT.
What this contract page answers
This is the canonical contract page for USASPENDING-NNX11CE84P. It summarizes the award identity, mission scope, obligated amount, customer, recipient, source evidence, and the exact program page that owns broader context.
Mission
Blue Origin Program
Amount
$99,940
Recipient
POLATOMIC, INC
Story status
Exact story joined
Contract evidence mix
Contract pages combine the normalized canonical row with linked actions, notices, spending points, bidder records, and source evidence when those records have been matched.
Actions
1
Notices
0
Spending points
1
Exact source records
1
Source and freshness notes
This page uses T-Minus Zero contract normalization plus linked public-source evidence. Award identifiers, source URLs, agency/customer fields, and amounts are shown only when available in the normalized source data.
Source label
USASpending award record
Freshness
Mar 02, 2026
Data policy
Published source fields only
Contract interpretation
Use this page to identify what the award is, who it is tied to, how much has been obligated, and which evidence rows support the contract story. Program pages own broader mission context and related contract families.
Award date
2011-02-18
Agency/customer
POLATOMIC, INC
Match confidence
92% match
Contract relationship map
The contract page owns row-level evidence. Program pages own broader mission context, story pages own narrative contract families, and public sources own exact award records.
Use these internal paths to move from this exact contract row into the mission hub, program contract index, source evidence, and broader program pages that own surrounding context.
Search-first answers for this contract entity and its source identifiers.
What sources feed the contract data on this site?
Contract entities combine USAspending award references with SAM.gov-normalized procurement records (including PIID-linked actions, notices, and spending rows when available).
Why is there a canonical /contracts URL when program pages already exist?
Program pages keep mission context, while /contracts URLs consolidate duplicate contract entities into one indexable canonical URL so search engines attribute ranking signals to a single record.
Which identifiers should I search to find a specific government contract?
Use any of these identifiers: USAspending Award ID, PIID, contract key, solicitation ID, notice ID, recipient/awardee name, or agency/customer name.
How often do contract pages update?
Contract pages revalidate on a 10-minute cadence, while upstream source data refresh timing depends on ingest jobs and source-side publication timing.
What is the difference between SAM.gov and USAspending in these records?
USAspending primarily provides award and obligation visibility, while SAM.gov captures procurement lifecycle context such as solicitation notices and related action thread signals.
Why can the contract amount differ from another source?
Amounts can differ across snapshots because some sources report base award value while others include modification deltas, cumulative obligations, or later adjustments.
Can one contract appear in more than one program section?
Yes. A contract may appear in multiple program contexts; canonical entities are designed to consolidate those overlaps into a single URL for indexing and discovery.
What is a PIID on a contract detail page?
PIID stands for Procurement Instrument Identifier. It is the contracting identifier used to track related awards, actions, and notices across a procurement thread.
Where should I verify the official source record for this contract?
Use the Source record link on the contract detail page. The page also links back to the program-native detail page and, when available, the Artemis story page for thread context.
Why are actions, notices, or spending rows sometimes missing?
Missing rows usually mean no matched records were returned yet for that identifier set in the current source snapshot, not that the contract entity itself is invalid.
What exact terms should I search to verify this specific contract?
Use these identifiers in search: USASPENDING-NNX11CE84P | NNX11CE84P. Add terms like "USAspending", "SAM.gov", or the awardee name for faster exact matching.